Renovating a hotel is not like renovating a home. The property often stays open, guests should not notice the works, and every room out of service is a room that cannot be sold. That is why the difference between a successful job and one that overruns time and budget almost always lies in the organisation, even before the design choices.

01

1. Survey and goals

It starts with the existing condition: measurements, building services, current materials and constraints. With the owners you set the goals: repositioning the property for another guest segment, renewing rooms and bathrooms, rethinking public areas, cutting energy use. Clear goals make it possible to decide what to keep and what to replace, and to estimate the budget more accurately.

Room under renovation with a ladder and unfinished walls
02

2. Design and 3D renders

The design sets layout, materials, lighting and furniture. Photorealistic 3D renders let you see the result before spending: owners approve rooms, lobby and restaurant on images very close to reality, and changes are cheap because they are made on screen, not on site.

03

3. The sample room

Before redoing dozens of rooms, fit out one completely: furniture, fabrics, lighting, bathroom. The sample room reveals details that drawings do not show, such as socket positions, the real footprint of the furniture, how colours look in daylight and how easy everything is to clean. Fixing a mistake in one room is far better than discovering it in all of them.

04

4. Permits and fire rules

The works need the building permits required by the municipality, and fire prevention rules weigh heavily in hotels. The Italian technical rule for accommodation, the Ministerial Decree of 9 April 1994, sets among other things the reaction-to-fire classes for curtains, upholstered furniture and mattresses; for existing properties the Decree of 6 October 2003 introduced additional measures, and larger properties now also fall under the technical rule of the fire prevention code. The framework depends on the size of the property and must be checked with the fire safety engineer (an overview of the applicable rules). In practice, it means choosing certified fabrics and upholstery from the design stage and keeping the certificates.

05

5. Phased works

If the hotel stays open, the works are split into phases: one floor or wing at a time, with separate routes for workers and materials, working hours compatible with guests' rest and protection against dust and noise. The most invasive work is concentrated in the low season. A shared schedule shows each week which rooms are out of service, so the front desk can manage bookings.

06

6. Custom furniture, lighting and details

Custom furniture has production lead times that must be planned in advance, because it has to arrive when the phase is ready, neither earlier nor later. Lighting, often underestimated, changes how rooms feel more than many pieces of furniture. Finally come the details that complete the experience: linen, signage and staff uniforms coordinated with the new style.

For hotel interiors, LUX LAB follows the work from design and 3D renders to furniture and uniforms, with a single point of contact; building works are carried out by a partner construction company.

07

FAQ

Can a hotel be renovated without closing?

Often, yes, by working in phases and concentrating noisy work in periods of lower occupancy. It depends on the scope of the works and the layout of the building.

What is the sample room for?

To test furniture, materials, lighting and maintenance in real life before repeating the solution in every room.

Who checks the fire requirements of materials?

The fire safety design is the job of a qualified engineer. Suppliers of fabrics and furniture must provide the required reaction-to-fire certificates.

08

In short

A good hotel renovation is decided by its organisation: clear goals, approved renders, a sample room, certified materials and phased works. To discuss your project, contact LUX LAB through the hotel interiors page.